My New Project, A Building Made From Recycled Material.
Page Three
After what seems like forever, I got the roof metal on and the ridge cap installed. It was good to get off the roof and move on to the next phase of the project.
Next the plywood for the sides needs to go up,,,,
<
And the window I picked up for $20.00 has to go in.
the sheet metal on the first side is up......
...and with the help of a friend, the second side is up also.
Now to get the rear wall done. First some more plywood strips.
Then the sheet metal. Now we have a back wall.
Now for the front wall. You can't see it, but I had to frame out the inside with a header for the garage door. Then the plywood and some flashing on the boards that will be exposed.
Now the sheet metal and the edge strips. With the exception of the garage door that I'll install later, we are done with this project. I'll bet my paycheck this one will not fall down under a snow load like the last one did. Now,,, what to do next.
You guessed it!!!
I could not say no to a concrete floor while doing another concrete project.