1967 Camaro Restoration Project
Page Seventeen
After a safe trip we're back home.
Ready to unload. Denise,, you catch it. LoL
Safe and sound back in the garage.
Not wasting any time here, Glen and I got the car blocked up, the front rotissorie removed, and the front subframe ready to bolt back up in place.
Sub frame lined back up to the car and bolted on.
With the front bolted back on now we're working on getting the rear part of the rotissiore off the car.
Who put that big head in the way of the picture?
Got the rear part of the rotissiore off. Now we can start putting the rear suspension back on.
Glen, lay the springs down in place and put the front spring pivot brackets on....
...Now roll the rear axle assembly into place.
Fantastic. Everything is hanging in place just right.
I forgot... is it torque first then drink, or drink first then torque. Whatever,, as long as we get both done correctly.
Glen came over the following evening and we got the fuel tank installed. That is a two man job I remember from the last Camaro I worked on. Front to rear fuel and brake lines are in place and we pretty much have a rolling car again.
It's a good thing we were given these step by step assembly instructions. I think we're up to step 18 now. LoL
Back over at Frank's, the hood, fenders, and valance pieces and getting their final prep work before priming.